Master Review — full sweep (so nothing's dropped)

Worker 🐝 · Tue June 9 2026 · 11:20 AM · 4-agent sweep: repos · GitHub issues · docs/steering · drop-check vs everything discussed

Headline verdict

The operation is in good shape and well-captured. Of everything we discussed (23 items), 18 are fully captured + owned, and the 2 real drops are now fixed (the MIS market-report restore + the Cloud Brain plan — both now have cards + docs). Repos are 9/12 clean; the docs layer is coherent. The work to do is mostly cleanup + a few process tightenings, not rescue.

1. Repos — committed / at-risk / cleanup

2. GitHub issues — what needs dealing with

Needs YOUR decisionIn progressStale → close
#2 cash-pressure protocol (classify before build) · #24 OneDrive→Google Drive migration (ties to Cloud Brain) · MIS-gate decisions #7 [P0] REDUCE/EXIT graduation · #10 [P1] SACS oscillation · levsms #1 roadmap #22 underwriting engine · #26/#27 bot powers · #29 portal md-render · #17 self-learning loop · BOS #1 Signal-OS (43d)

The MIS engine issues (#7/#10/#11/#12/#13/#14) are freeze-gated — they don't move until you open a deploy window. That's correct, not stuck.

3. Docs / steering / outputs — healthy

4. Drop-check — was everything captured?

18/23 fully captured + owned. The 2 real drops are now fixed:
  • MIS market/ticker report (was flagged #1 but had no card) → card created + directive to MIS+#042.
  • Cloud Brain / always-on Claude Code (discussed, no plan) → card + docs/CLOUD_BRAIN_PLAN.md created (cost, comms, limits, security all worked out).
Still pending YOUR word: the money-card proof-gate (go b / leave) · Mildred's Citi-login request (no card yet — I'll add one) · the 11 merges + 8 gut-checks from the card audit.

5. How to work this better (the process tightenings)

6. Macro / micro

MACRO: you're converging on the right shape — one brain (memory), one operator (Worker 🐝), sessions that report + get steered, a clean card system, and a path to an always-on cloud operator. The bones are good. The throughline you keep naming — stop building, make it work, get cash-flow positive — is the correct north star.

MICRO (today): ① Call Asher 212-500-1312 · ② your MIS report restore is now the #1 build · ③ the morning-brief delivery fix · ④ tell me the trade you just made so MIS reflects it (it can't auto-see Schwab). Everything else is owned and moving.
Source trail — 4 parallel read-only agents (git state across 12 repos · GitHub issues across all repos · docs/steering/outputs inventory · drop-check vs the 23 items discussed 6/8–6/9). Worker 🐝 synthesized + fixed the 2 drops + pushed the at-risk Eden commit. Generated Tue Jun 9 2026 · 11:20 AM EDT · outputs/2026-06-09_11-20_audit_master-review-full-sweep.html · repo private.