⚡ GO DAY — Fable Launch Prep
Every dormant / blocked / staged / forgotten item, teed up with the move. Tomorrow = execute, not discover.
Generated Tue Jun 30 2026 · for Wed Jul 1 · Worker 🐝 · the opposite of Armageddon
| Item | State | The move |
| HOA foreclosure (9312/9332) | LIVE | $16.9K cure verified vs $29.6K plan → via Asher. Get Asher's decision, fund the cure. This gates the ops-api deploy ("after HOA"). |
| Darchei registration + aid | LIVE | Late + fees. Register/pay + call aid Mrs. Kurtz 718-868-2300 x222 + Sbain@darchei.org. |
| Taxes — $9,750 Z&E | BLOCKED | Master blocker (gates FACTS aid + refunds-to-cashflow). Decide pay vs dispute. |
| Jul-1 utility cluster ~$4.3K | LIVE | NatGrid + Kia unscheduled (from the utilities map). Pay/schedule before interruption. |
| Obligations → into the brief | RESEARCH Brain | Wire Monthly Obligations V1 data into the live Telegram/portal brief so money shows without BOS emails. Brain's thread lands → wire it. |
These are the highest-leverage: the work is done, they just need a push/verify to ship.
| Item | State | The move |
| ops-api inherit-deploy | STAGED MIS/Brain | Bundle ready: mis-bridge + /mis/brief + /mis/tile + grocery-remove + 5609 + cache-buster + live-calendar. Run the inherit-deploy (keeps 30 secrets) once HOA clears. Unblocks MIS cockpit auto-upgrade + live money tiles. |
| CM Invoice — familiar rebuild | STAGED | 6 safe fixes pushed. The 2 structural moves (customer top-right + simple Total/Deposit/Balance) staged. Apply Setup/Repair WITH Mom, verify on a test invoice, then start her cadence. |
| WhatsApp capture v0 | STAGED | iOS Shortcut spec ready (posts to the command inbox, no deploy). Sam builds the 7-step Shortcut; I wire the secret. Ends the vendor/cleaner blind spot. |
| Dvar Torah weekly print (#271) | BLOCKED | Needs a fresh session with personal Gmail live. Print the Rav Schlesinger booklet once (RTL duplex, MFC-J480DW), then cadence it every Friday. |
| Contacts CRM stand-up | READY | Clean 1,375-row sheet DONE. Build Lead/Client/Investor queues + Mildred surfacing (Cluster C). Immediate: pull the 58-name Investor list for SWU outreach. |
| Morning-brief triple dedup | DEDUP Brain | 6:48 Apps Script + 7:30 routine + 7:45 CF cron all brief the morning. Keep 7:30 as builder; retire/verify-only the other two. One-owner call. |
| Item | State | The move |
| Cloud Memory Layer (flagship) | DORMANT | Blueprint done (June close-out). Build Phase 1 = memory sync across surfaces. The spine everything else hangs on. |
| Always-on cloud VM + home miniPC | DORMANT | Brain off-PC (talk to Worker with laptop closed) + cameras LAN-durable. Stand up the VM; move go2rtc to a home miniPC. |
| BOS v3 / obligations decision | DECIDE Brain | v3 coded but never run; OR formally retire BOS-email for the cloud brief + wire obligations in. Brain's research resolves it. |
| SWU / Curio deal | READY | Diligence brief done for Mark; investor list now clean + ready. Send to Mark + start investor outreach. |
| MIS — META trade + scale | READY MIS | Blackout fixed, 186-ticker universe recovered, META sized (6sh @565.55, ATR $515/$622). Sam places META; scale to 200-250 after the freeze gate. |
| Family layer | HALF-BUILT | Chanie two-way, kiosk, per-person access, camera embeds — a cluster. Sequence + finish the top 1-2. |
| Youth / Bar-Mitzvah-money product | DORMANT | Demand-test first: send the WhatsApp "do your kids have a Fidelity Youth acct?" message to a few friends before building. |
| Verizon → US Mobile | DORMANT | Port Sam+Chanie+house lines, cancel Verizon (closes #022/#208/#298). |